A general updated agenda of the data reduction is now being discussed. Those delays will impact on the different developments of the GENIUS project. Those details will be studied and actions will be taken at the plenary meeting in Viena (July 7 -8).
200 - User community
Two postdocs recruited for WP 200: GrĂ¡inne Costigan and Arkadiusz Hypky. Will start in May and September respectively
Yamada visitied to the University of Tokyo for discussing hardware evaluation of Nano-JASMINE and data quality, and also visited to the National Astronomical observatory Japan for discussing hardware evaluation test of Nano-JASMINE in March 2014. Also visited National Astronomical Observatory japan and the University of Tokyo for scientific requirements of Nano-JASMINE / small-JASMINE data for scientific output. Also visited Dresden for participating AGIS20 (http://wiki.cosmos.esa.int/gaia-dpac/index.php/CU3:Core_Processing:Meetings:AGIS_20) and Nano-JASMINE data processing meeting (http://wiki.cosmos.esa.int/gaia-dpac/index.php/Nano-JASMINE_data_processing) in May 2014.
300 - System design
Staff involved and effort expended (Full-Time Equivalent):
(T3.1) Organised System Architecture bi-monthly telecom (25th March 2014) which included GENIUS developers
(T3.1) Represented GENIUS system design team at CU9 crossmatch teleconference (11th March 2014)
(T3.3) INAF-OATs team continuing development of VO-Dance for generic TAP functionality; new developer recruited
UEDIN team continuing development of
(T3.4) Distributed Query Processing generic design: draft Interface Coordination agreement (ICD) under development
(T3.2) Working on enhancements to Gaia CU9 Data Modelling UI application to aid in CU9 interface control
(T3.3) UEDIN developers attended IVOA meeting at ESAC and liaised with ESAC-SAT members
(T3.1) UEDIN management contributed to CU9 archive prototype data model from a systems design perspective
Deviations:
Deliverable 3.1. Management part covered by the SDP already produced and at the Participant Portal. Technical aspects are work in progress. it has been agreed to write several interface coordination agreements with ESAC-SAT. We have been working on the Distributed Query Processing ICD in the first instance in order to iterate with ESAC-SAT on the presentation and content.
400 - Data Exploitation
T4.3 - Data mining
Teleconference: data mining options and planning 27-5-2014 (Julbe, Sarro, Luri)
We have re-deployed a larger test environment with the necessary framework for initial data mining tasks (Cloudera Framework and Spark).
A High level design of the datamining framework have been designed in order to have a long term development plan.
A significant dataset have been generated to evaluate the first test case (PCA over spectra), two level 4 HTM regions.
The PCA over GOG spectra has been executed both with Mahout and Spark technologies on a local scale with a very small data sample.
We are finishing the setup to test the sample code on the CESCA cluster over the BP/RP spectra dataset generated (two HTM level 4 regions).
A first "challenge" use case has been identified and discussed with partners (Evaluation of galaxy models with GAIA data).
T4.4 - VO Tools and services
Taylor has been working on interfacing TOPCAT to Gaia archive data. Progress so far is on two fronts:
Firstly, establishing access through the GACS TAP service at ESAC, which requires assessing and ensuring correctness of that service. 10 Mantis issues have been filed, 7 so far resolved, 3 still under investigation by ESAC staff.
Secondly, providing direct access from TOPCAT/STILTS to the Xmatch service run by CDS. This work is ongoing.
Deviations:
Deliverable 4.1. has been delayed with an expected delivery by the plenary meeting in Viena.(July 7 - 8).
500 - Scientific Validation
T5.1-Technical coordination
The Validation Test Specification document taking into account all planned tests is being issued
Teleconferences have been organised with WP managers
The software environment is being defined
T5.2-Definition of problem cases, validation scenarios and tools
Adding to the data model the validation flags for the VTS WP942-VAL-210-0X0 to -260-0X0 (March 2014) - Boudreault
Corrections on the validation test designs for VTS WP942-VAL-210-0X0 to -260-0X0, and comments given to Fabricius+Antiche for VTS WP942-VAL-110-0X0 to -150-0X0 (March 2014) - Boudreault
Developing codes for validation test 210-010, 210-020, 220-010, and 220-030. Developing new codes for validation test 230-010 and 240-010 (March 2014) - Boudreault
Teleconference on validation test designs for WP942-VAL-1X0 and -VAL-2X0 (March 2014) - Antiche, Arenou, Boudreault, Fabricius
Corrections in the numbering of the VTS in WP942 for GAIA-C9-SP-OPM-FA-061 (April 2014) - Boudreault
Adding and corrections done in the data model to reflect the current VTS in WP942 (April 2014) - Arenou, Boudreault
Developing codes for VTS ; now WP942-110-0X0, -120-0X0, and -210-0X0 are working/ready with corresponding JUnits (April 2014) - Boudreault
Working on a technical note to present our work on the artefacts in the catalogue due to the presence of bright stars, which is VTS WP942-VAL-220-010 (April 2014) - Boudreault
List provided on how to include errors in GOG; this is now included in GAIA-C9-SP-OPM-FA-061 for each VTS (May 2014) - Boudreault
Developing codes for VTS ; now WP942-110, -120, and -210 are ready, or ready and needing only minor updates, with corresponding JUnits (May 2014) - Boudreault
Technical note on the bright stars problem still ongoing (May 2014) - Boudreault
Writing Mantis issues 0026655, and 0026909 (May 2014) - Boudreault
T5.3-Simulation versus reality: from models to observables
Houri Ziaeepour has been recruited, starting from April 1st on
After a configuration step, test comparing the galaxy model to the IGSL are beginning (April)
T5.4-Confronting Gaia to external archives
In this work package, Laura Ruiz-Dern, on a PhD position, is starting implementing the tests concerning the proper motions (April)
560-Transversal tools for special objects
Definition of an engineer post-doc profile and successful selection of a candidate: M. Kudryashova for 24 month at IMCCE, starting in August 2014. The work will be performed within WP560. First step is to acquire expertise in ephemerides computation, Gaia observations of SSOs, and then define the various specific tests (before their design in a second step).
600 - Support
T6.3-Science Alerts testbed
Teleconference on science alerts data model, 14-3-2014 - Luri, Hambly, Hodgkin (on behalf of Nic Walton)
First public version of the community portal (March, 28th)
Editor users sent to GENIUS WP leaders (March, 30th)
The Executive Board is considering the creation of an Editorial Board to carry out a high-level supervision of the portal contents. A second level of collaborators might be defined when the Editorial Board is set up (March, 14th).